Cost of Goods Manufactured Calculator (COGM)

Cost of Goods Manufactured (COGM) Calculator

This tool calculates the total cost of goods that were completed during a specific accounting period and transferred from Work-in-Process (WIP) inventory to Finished Goods inventory.

Enter the costs for the period below. Ensure all values are non-negative numbers and use consistent currency units.

Input Costs for the Period

Value of partially finished goods at the start of the period.
Sum of direct materials used, direct labor, and manufacturing overhead for the period.
Value of partially finished goods at the end of the period.

Understanding Cost of Goods Manufactured (COGM)

What is COGM?

The Cost of Goods Manufactured (COGM) represents the total costs incurred in completing products during a specific period. It includes all costs associated with moving products through the Work-in-Process (WIP) inventory stage, reflecting the direct materials, direct labor, and manufacturing overhead applied to those units that were finished.

COGM Formula

The standard formula to calculate the Cost of Goods Manufactured is:

COGM = Beginning Work-in-Process Inventory + Total Manufacturing Costs Added - Ending Work-in-Process Inventory

Where:

  • Beginning Work-in-Process (WIP) Inventory: The value of goods that were started but not completed at the beginning of the accounting period.
  • Total Manufacturing Costs Added: The sum of all costs put into production during the period, including Direct Materials Used, Direct Labor, and Manufacturing Overhead.
  • Ending Work-in-Process (WIP) Inventory: The value of goods that were started but not completed at the end of the accounting period.

COGM is a crucial figure for manufacturing businesses as it feeds directly into the calculation of Cost of Goods Sold (COGS) on the income statement:

COGS = Beginning Finished Goods Inventory + Cost of Goods Manufactured - Ending Finished Goods Inventory

Components of Total Manufacturing Costs Added

For clarity, the "Total Manufacturing Costs Added" is typically calculated as:

Total Manufacturing Costs Added = Direct Materials Used + Direct Labor + Manufacturing Overhead

Where:

  • Direct Materials Used: Cost of raw materials that become a physical part of the finished product. Calculated as: Beginning Raw Materials Inventory + Raw Material Purchases - Ending Raw Materials Inventory.
  • Direct Labor: Wages paid to workers who directly convert raw materials into finished goods.
  • Manufacturing Overhead: All other indirect costs associated with running the factory, such as indirect materials, indirect labor, factory rent, utilities, depreciation on factory equipment, etc.

This calculator simplifies this by asking for the combined "Total Manufacturing Costs Added".

Cost of Goods Manufactured Examples

Here are 10 examples illustrating the COGM calculation:

Example 1: Simple Calculation

Scenario: A small furniture maker needs to calculate COGM for a month.

Inputs:

  • Beginning WIP Inventory: $5,000
  • Total Manufacturing Costs Added: $25,000
  • Ending WIP Inventory: $4,000

Calculation:

COGM = Beginning WIP + Total Mfg Costs - Ending WIP

COGM = $5,000 + $25,000 - $4,000

COGM = $30,000 - $4,000 = $26,000

Result: The Cost of Goods Manufactured for the month is $26,000.

Example 2: Increase in WIP Inventory

Scenario: A manufacturer finished fewer goods than they started this period.

Inputs:

  • Beginning WIP Inventory: $10,000
  • Total Manufacturing Costs Added: $40,000
  • Ending WIP Inventory: $12,000

Calculation:

COGM = $10,000 + $40,000 - $12,000

COGM = $50,000 - $12,000 = $38,000

Result: COGM is $38,000. The ending WIP ($12,000) is higher than the beginning WIP ($10,000), meaning some costs added remained in WIP.

Example 3: Decrease in WIP Inventory

Scenario: The factory completed more goods than they started this period.

Inputs:

  • Beginning WIP Inventory: $8,000
  • Total Manufacturing Costs Added: $35,000
  • Ending WIP Inventory: $6,000

Calculation:

COGM = $8,000 + $35,000 - $6,000

COGM = $43,000 - $6,000 = $37,000

Result: COGM is $37,000. The ending WIP ($6,000) is lower than the beginning WIP ($8,000), meaning costs from the beginning inventory were completed and moved out.

Example 4: Period with No Beginning WIP

Scenario: A new production line starts with no existing work in progress.

Inputs:

  • Beginning WIP Inventory: $0
  • Total Manufacturing Costs Added: $60,000
  • Ending WIP Inventory: $15,000

Calculation:

COGM = $0 + $60,000 - $15,000

COGM = $60,000 - $15,000 = $45,000

Result: COGM is $45,000. Some of the costs added ($15,000) remain as unfinished goods at the end.

Example 5: Period with No Ending WIP

Scenario: All work in progress at the start and all work started during the period is completed.

Inputs:

  • Beginning WIP Inventory: $7,000
  • Total Manufacturing Costs Added: $50,000
  • Ending WIP Inventory: $0

Calculation:

COGM = $7,000 + $50,000 - $0

COGM = $57,000 - $0 = $57,000

Result: COGM is $57,000. All costs in beginning WIP and all costs added resulted in completed goods.

Example 6: All Inventory Values Change

Scenario: Calculating COGM with varying inventory levels.

Inputs:

  • Beginning WIP Inventory: $12,500
  • Total Manufacturing Costs Added: $75,800
  • Ending WIP Inventory: $9,200

Calculation:

COGM = $12,500 + $75,800 - $9,200

COGM = $88,300 - $9,200 = $79,100

Result: The Cost of Goods Manufactured is $79,100.

Example 7: Small Values

Scenario: Calculating COGM for a very short period or small batch.

Inputs:

  • Beginning WIP Inventory: $150
  • Total Manufacturing Costs Added: $800
  • Ending WIP Inventory: $120

Calculation:

COGM = $150 + $800 - $120

COGM = $950 - $120 = $830

Result: COGM is $830.

Example 8: Large Values

Scenario: Calculating COGM for a large corporation over a quarter.

Inputs:

  • Beginning WIP Inventory: $1,200,000
  • Total Manufacturing Costs Added: $8,500,000
  • Ending WIP Inventory: $1,350,000

Calculation:

COGM = $1,200,000 + $8,500,000 - $1,350,000

COGM = $9,700,000 - $1,350,000 = $8,350,000

Result: COGM is $8,350,000.

Example 9: Calculating COGM for COGS

Scenario: Showing how COGM fits into the COGS calculation.

First, calculate COGM (using Example 1 values): $26,000.

Inputs for COGS:

  • Beginning Finished Goods Inventory: $18,000
  • Cost of Goods Manufactured: $26,000 (Calculated above)
  • Ending Finished Goods Inventory: $22,000

Calculation (COGS):

COGS = Beginning Finished Goods + COGM - Ending Finished Goods

COGS = $18,000 + $26,000 - $22,000

COGS = $44,000 - $22,000 = $22,000

Result: The Cost of Goods Sold is $22,000.

Note: This calculator specifically finds COGM, but this example shows its use.

Example 10: When COGM = Total Manufacturing Costs

Scenario: If there is no beginning or ending WIP inventory.

Inputs:

  • Beginning WIP Inventory: $0
  • Total Manufacturing Costs Added: $100,000
  • Ending WIP Inventory: $0

Calculation:

COGM = $0 + $100,000 - $0

COGM = $100,000

Result: COGM is $100,000. When WIP inventories are zero, all manufacturing costs added become the cost of goods manufactured.

Frequently Asked Questions about COGM

1. What is Cost of Goods Manufactured (COGM)?

COGM is the total cost of products that were completed during a specific accounting period, representing the costs transferred out of the Work-in-Process (WIP) inventory and into the Finished Goods inventory.

2. What is the main formula for COGM?

COGM = Beginning Work-in-Process Inventory + Total Manufacturing Costs Added - Ending Work-in-Process Inventory.

3. What are "Total Manufacturing Costs Added"?

These are the costs incurred during the period specifically for production: Direct Materials Used, Direct Labor, and Manufacturing Overhead.

4. How is COGM different from Cost of Goods Sold (COGS)?

COGM is the cost of goods *completed* during the period. COGS is the cost of goods *sold* during the period. COGM is a component used to calculate COGS.

5. What is Work-in-Process (WIP) inventory?

WIP inventory consists of goods that have been started in the manufacturing process but are not yet completed finished goods.

6. Can COGM be zero or negative?

COGM should generally not be negative. It represents costs incurred. It can be zero if there was no production activity and no beginning WIP inventory. Negative results in the calculation often indicate incorrect input data (e.g., ending WIP is unrealistically higher than beginning WIP plus costs added).

7. Why is calculating COGM important?

It's essential for manufacturing companies to determine the cost of production for the period, which is needed for inventory valuation (Finished Goods) and calculating Cost of Goods Sold on the income statement, impacting profitability reporting.

8. What does it mean if Ending WIP is higher than Beginning WIP?

This means that more goods were started or remained unfinished during the period than were completed from the beginning inventory or started/completed within the period. The cost value tied up in unfinished goods increased.

9. Does COGM include selling or administrative costs?

No, COGM includes only *manufacturing* costs (Direct Materials, Direct Labor, Manufacturing Overhead). Selling, administrative, and general expenses are period costs, not product costs, and are not included in COGM.

10. How does this calculator handle currency units?

The calculator performs the mathematical calculation. You must ensure that all your input values (Beginning WIP, Total Manufacturing Costs, Ending WIP) are in the same currency unit (e.g., all in USD, all in EUR, etc.) for the result to be meaningful in that unit.

Ahmed mamadouh
Ahmed mamadouh

Engineer & Problem-Solver | I create simple, free tools to make everyday tasks easier. My experience in tech and working with global teams taught me one thing: technology should make life simpler, easier. Whether it’s converting units, crunching numbers, or solving daily problems—I design these tools to save you time and stress. No complicated terms, no clutter. Just clear, quick fixes so you can focus on what’s important.

We will be happy to hear your thoughts

Leave a reply

Cunits
Logo